What it does
Your team already logs time on cards (the timer or Log time in a card). Labor cost turns that time into money:
- Hourly rates: owners and admins set a rate per person and a default rate for everyone else. Nobody else can see rates or any labor cost.
- Per project: the project Dashboard shows labor cost, hours logged, and the SKUs the time was spent on (owners and admins only).
- Per SKU: time on a card is split evenly over the products linked on it. Time on cards with no linked product is shown as unallocated.
- Profit reporting (optional, off by default): switch on Add labor to profit reports and Reports, Margin and Profit gains a labor line and profit after labor for each SKU. Your existing profit numbers never change; the labor numbers are added beside them.
When to use it
- You pay people for product work (photos, listings, kitting, inspection) and want true profit per SKU.
- You want to know what a launch or a Q4 project really cost in people's time.
Step by step
- Open Workspace, Projects, the Timesheets segment, and click Labor Rates (owners and admins). The Labor Cost card on a project Dashboard links there too.
- Set a Default hourly rate and your currency.
- Enter a rate for each person who is paid differently. Leave blank to use the default.
- Turn on Add labor to profit reports if you want the labor line in the Margin report.
- Click Save.
- Make sure cards link the products they are about (type # in a card or use Link a record) so time is allocated to the right SKU.
Every button and setting
- Add labor to profit reports: off by default. Adds
laborand profit after labor beside existing numbers. - Default hourly rate: used for anyone without their own rate and for imported time.
- Rate per person: blank means the default.
FAQ
Who sees labor cost? Owners and admins on the Projects pages. When the profit switch is on, people who can see the Margin report see the labor line per SKU, never the rates.
Does it change my accounting export? No. It only adds a line in the Margin report.
What window does the report use? The same days as the report (time logged in that window).
Troubleshooting
- Labor is all unallocated: link products on the cards people log time on.
- Labor shows 0: rates are not set yet, or nobody logged time in the window.