What it does
Work starts everywhere: an order with a problem, a late purchase order, a product that needs new photos, a chat message, a line in an SOP. Make a task turns any of them into a project card in one click, without retyping:
- The source is linked: the order, PO, product or supplier becomes a live record chip on the card (stock, status, profit). A chat message or doc line is quoted with a link back.
- A sensible title: "Follow up on PO-1042", or the first line of the message.
- A due date from the text: "today", "tomorrow", "by Friday", "next week", "Nov 15", "in 3 days".
- An assignee from the text: the first person @mentioned.
- The right project: your most recently used project you can edit, or the team's "Team tasks" project. Pick a project instead when you prefer.
Daily Tasks have their own Send to board button with the same idea.
When to use it
- An order needs a follow up with the customer or the carrier.
- A purchase order is late and someone must chase the supplier.
- A product needs photos, a listing fix or an inspection.
- A teammate asks for something in Team chat or a doc.
Step by step
- Open an order, purchase order, product or supplier. Find Project tasks in the drawer.
- Click Add a task, then Quick task (my latest project) to create it at once, or pick a project from the list.
- The card opens with the record linked. Add details, people and dates.
- In Team chat, open a message's three dots and pick Make a task.
- In Docs, select the text and click Make a task in the bar above the selection. The card links the page and quotes the text; a date in the text ("by Friday") becomes the due date.
- SOP runs and meeting notes make their cards the same way: the card links the page and moves to Done when the SOP run is closed.
Every button and setting
- Quick task: creates the card in your latest project (or Team tasks) and opens it.
- Or add to: choose the project yourself.
- Project tasks list: every card already linked to this record, with live status.
FAQ
Who can make tasks? Anyone who can edit at least one project. Viewers and guests need to pick a project they can edit.
Can I link a record I can't see? No. Records are checked against your access.
Does the card move when the record changes? Yes, if the project has automatic moves set (for example when a linked PO is received).
Troubleshooting
- "Pick a project you can add tasks to": your role can't create the Team tasks project; ask an admin to add you to a project.
- "That record was not found": it was deleted, or it belongs to another store.